We Complete A Bunch of Odds and Ends Around the Club (Part 3)
So there
The punch list of To Do items continues to grow shorter, which is a great thing. And the number of those items that is considered major construction items rather than finishing touches has dwindled down to probably just 1 item.
Now that we have the Dehumidifier Installed, we needed to install the Sock, which is the fabric duct that will direct the air around the building properly. The Sock is up and in place. We need to make some modifications to prevent it from being so loud when it gets turned on, as well as to minimize how much the air flow is moving around our e-ceiling. So at this point, we will call this project 75% done.

We have also started to stain and polyurethane some of the custom built woodwork that we have added.


We put the new chairs into our warm room. You might also see our new TV that will be nice, especially for Corporate Events to have a place to show their PowerPoint presentations.

And while this might seem small, this is such a big deal for a club that went from arena to dedicated ice, and has never had these. We now have our very own Dial Measure and Biter Bar.